TUFLOW SWMM Tutorial M01 Check QGIS: Difference between revisions

Content deleted Content added
Line 28:
<li>Use the 'Apply TUFLOW Styles to Open Layers'.
<li>The [[Check_Files_1d_to_2d_bc | _1d_to_2d_check_R]] file shows the cells selected by the SX boundary links (these connect the 1D SWMM objects to 2D TUFLOW). It is recommended that the 2D cell width (i.e. cell side length x number of cells) be equal or greater than the width of the 1D culvert. Zoom to each structure to inspect the SX links. In all cases the 2D linkage is 10m wide. Is this equal or more than the width of the associated 1D culvert?
 
<li>The [[Check_Files_1d_to_2d_bc | _1d_to_2d_check_R]] file shows the cells selected by the SX boundary links (these connect the 1D SWMM objects to 2D TUFLOW). It is recommended that the number of selected cells has at least the width of the associated 1D culvert. Zoom to each structure to inspect the SX links. This will ensure that the HX and SX connections in the'''2d_bc_SWMM_Culvert_Connections_001_L''' layer are accurate.
 
<li>Use the '''TS01_5m_001_1d_to_2d_check_R''' layer to check the accuracy of the HX and SX connections in the '''2d_bc_SWMM_Culvert_Connections_001_L''' layer.
<li>The [[Check_Files_2d_grd | _grd_check_R]] is the 2D grid defined by the 2d_code layer and contains a region object for each cell. This is a useful check file to understand how the model is orientated and the 2D cell size in relation to the 2D hydraulic controls and 1D hydraulic structures. In this tutorial, the grid is orientated to align with the downstream road.
<br><br>
{{Video|name=Animation_TS1_Check_03b.mp4|width=1235}}<br>
<li>The '''TS01_5m_001_grd_check_R''' file is also useful for
<li>The [[Check_Files_2d_grd | _grd_check_R]] is the 2D grid defined by the 2d_code layer and contains a region object for each cell. This is a useful check file to understand how the model is orientated and the 2D cell size in relation to the 2D hydraulic controls and 1D hydraulic structures. In this tutorial, the grid is orientated to align with the downstream road.
:*Check the positions of the HX and SX connections in the '''2d_bc_SWMM_Culvert_Connections_001_L''' layer are accurate.
<br>