Flood Modeller Tutorial Module02: Difference between revisions

Content deleted Content added
 
Line 200:
[[File:M07 ccA Results.PNG|800px]]
 
=Conclusion=
=Conclusions=
We have added to the model a final proposed development scenario. Using the Create TIN Zpts command, we have altered the ground elevations to represent the development. We have also added a 1D pipe network which has been linked to the 2D domain as well as feeding flows in the 1-dimensional channel represented within Flood Modeller. A pit inlet database has been created to specify a depth-discharge relationship for flow into and out of the pits. This allows us to create a fully integrated urban drainage model comprises 1D representations of the pipe network and river system together with the 2D surface.<br>
For further training opportunities see <u>[https://tuflow.com/training/training-course-catalogue/ TUFLOW Training Catalogue]</u> and/or contact <u>[mailto:training@tuflow.com training@tuflow.com]</u>. <br>
 
<br>
{{Tips Navigation
|uplink=[[Flood_Modeller_Tutorial_Model| Back to Flood Modeller Tutorial Model]]
}}