FMA Challenge 1 (1D-2D linked): Difference between revisions

Content deleted Content added
Rachel (talk | contribs)
No edit summary
Rachel (talk | contribs)
No edit summary
Line 28:
*There are no accredited levees within the model domain.
*In the case that standards and specifications need to be referenced, please refer to FEMA guidelines, assuming the event described in this challenge represents the 100-year event. (Except, you are not limited by FEMA’s approved software list, and may use any software you have available for the numerical analysis of this Challenge)
*Depth grids should be developed based on the provided '''Appendix N - Flood Risk Data Development and Analysis (Public Review).pdf''' guidelines. The modeler will need to determine an appropriate grid size.
 
The generated model given the preceding guidance must achieve the following deliverables.
 
=Deliverables=