1D Pits: Difference between revisions

From Tuflow
Jump to navigation Jump to search
Content deleted Content added
Rohan.king (talk | contribs)
Rohan.king (talk | contribs)
Line 31: Line 31:
<br>
<br>
<font color="blue"><tt>Pit Search Distance</tt></font> <font color="red"><tt>==</tt></font><tt>xxx</tt><br>
<font color="blue"><tt>Pit Search Distance</tt></font> <font color="red"><tt>==</tt></font><tt>xxx</tt><br>
<font color="blue"><tt>Read GIS Network</tt></font> <font color="red"><tt>==</tt></font><tt>..\model\mi\1d_nwke_*****.MIF</tt><br>
The order of the 'Pit Search Distance' command is important as it can be repeated multiple times with different values that are assigned to the 1d_nwke(s) below the Pit Search Distance command.
<br>
<br>
[[File:Pit_search_distance_check.JPG|border|500px]]
[[File:Pit_search_distance_check.JPG|border|500px]]

Revision as of 20:04, 3 February 2016

Page Under Construction


Introduction




Pit types

  • Introductory blurb explaining the types of pits you can do.


Real Life Examples

Some common pit types are shown below. Note: not all variations of side entry pits, grated pits, gully pits (pots) or any similar structure are displayed, the images are typical examples of what can be modeled as a 1D pit structure within TUFLOW.

UK Gully pits


Typical Kerbed Entry pits


Linking

  • Various options on linking to 2D

Pit search radius

  • More guidance on the pit search radius

Within the *.ecf the following command is required to have TUFLOW connect floating nodes into the 1D network where connectors are not snapped to channel ends:

Pit Search Distance ==xxx
Read GIS Network ==..\model\mi\1d_nwke_*****.MIF
The order of the 'Pit Search Distance' command is important as it can be repeated multiple times with different values that are assigned to the 1d_nwke(s) below the Pit Search Distance command.



Any further questions please email TUFLOW support: support@tuflow.com