TUFLOW Example Models: Difference between revisions

Content deleted Content added
No edit summary
Line 66:
| See Section <u>[[TUFLOW_Example_Models#1D Culverts, Bridges, Weirs| EG11]]</u>, <u>[[TUFLOW_Example_Models#1D Operating Structures| EG12]]</u>, <u>[[TUFLOW_Example_Models#1D Pipe Network / 2D Floodplain Modelling| EG15]]</u>
|-
| rowspan="1815" colspan="2" id="Output Options" | <b>Output Options</b>
| 2D xmdf (binary time series) and grid (maximums) output
| EG02_001.tcf
Line 78:
| Time and duration of inundation (Time Output Cut-off = Hazard)
| EG02_004.tcf
|-
| Gauge level map output interval control (2d_glo)
| TUFLOW Classic Only. Future TUFLOW HPC release
|-
| 2D SGS high resolution grid output
Line 99 ⟶ 96:
| 2D structure outputs
| EG02_011.tcf
|-
| 2D long Profile
| TUFLOW Classic Only. Future TUFLOW HPC release
|-
| 1D/2D reporting locations
| EG02_013.tcf
|-
| Translating gauge data information to catchment receptors
| TUFLOW Classic Only. Future TUFLOW HPC release
|-
| Evacuation route inundation reporting (2d_zshr) (Route Cut Off Type = Depth)