Tutorial M10 001 Results QGIS: Difference between revisions

Content deleted Content added
No edit summary
 
Line 11:
<li>Use the Cross Section tool to plot the bathymetry and bed elevation (elevation at the beginning of the simulation) at the location of the dam break. The dam break begins at 1 hour and takes 15 minutes to fully develop:<br>
<br>
{{Video|name=Animation_M10_001_Results_01d.mp4|width=1238}}<br>
[[File:Animation M10 001 Results 01d.gif]]<br>
<br>
<li>Use the Plot Time Series tool to see the time series of the bathymetry and water level at the location of the dam break, whilst viewing the depth result type. Due to the IWL, water is within the dam at the beginning of the simulation <br>
<br>
{{Video|name=Animation_M10_001_Results_02a.mp4|width=1238}}<br>
[[File:Animation M10 001 Results 02a.gif]]<br>
<br>
</ol><br>