FMA Challenge 2

From Tuflow
Revision as of 12:24, 28 November 2014 by Rachel (talk | contribs)
Jump to navigation Jump to search

Introduction

If you haven't already completed FMA Challenge 1, please see this FMA Challenge 1 page. This page is for TUFLOW users of intermediate to advanced ability.

In this challenge, a tidally influenced floodplain and riverine system will be explored along the California Coast. More information is available in the "tidal-description.docx" in the ZIP compressed file provided.


From this challenge, it is expected the user will develop their skills in:

  • Understanding tidal influences on floodplains and riverine systems,
  • Influence of cell resolution on results and whether or not the model should contain a 1D component;
  • Using a looped batch file to run through scenarios;
  • Understanding comparisons between three different 2D solvers. These include TUFLOW classic, TUFLOW GPU and TUFLOW FV.

Data for this model is provided via ZIP compressed file posted on the internet/FTP for download.

Relevant Tutorials

It may be useful to revisit some of the following tutorials:


Information to Modelers

Assignment of all parameters for this analysis are at the discretion of the modeler. A high resolution aerial image is provided so that land cover details can be inspected. Information on the problem definition can be found on FMA_Challenge_Models/FMA_Scenario2/FMA_Challenge_Model_Introductions.


Relevant Files

It is up to the modeler's discretion to determine what GIS package to use, what text editor to use, and how to run their models (batch mode or within the text editor).All relevant files can be found on FMA_Challenge_Models/FMA_Scenario2/

Solution

A sample solution has been presented, courtesy of BMT WBM.

Cross section spacing, Grid Size, and Mesh Element Size

Fixed grid models of different resolutions and a flexible mesh model were set up. The fixed grid domains were orientated north-south.

The coarsest fixed grid and flexible mesh resolutions were sufficiently detailed to represent the river bathymetry, so no 1D/2D coupling was incorporated. A fully 2D solution is preferable over a 1D/2D linked representation provided the 2D resolution of the primary flowpaths is sufficiently fine. A minimum recommended 2D resolution across the river for TUFLOW for this model is a 30m grid (it is recommended that a minimum of 4 fixed grid cells be used for modeling a primary flowpath). For this model the upper sections near the two inflows are not represented well, especially the northern Tributary Inflow. However, this is unlikely to have an adverse effect on the objectives of the modeling, but would affect the comparison to the high water marks near these inflows.

As there is no 1D/2D linking, Challenge 2 provided an opportunity to provide some comparisons between our three different 2D solvers. Results from TUFLOW (finite difference implicit solution), TUFLOW’s GPU Module (explicit finite volume GPU solver over a grid), and TUFLOW FV (explicit finite volume flexible mesh) are presented.

The number of cross sections, grids, or mesh elements used were as follows:

2D Domain Active 2D Cells/Elements
10m (grid) 727, 865
15m (grid) 323, 364
30m (grid) 80, 842
FM (Flexible Mesh)* 17, 479

N.B. For the FM (Flexible Mesh) within the main flow channels the typical element width is 20 m and length 50 m (quadrilateral elements), and on the floodplains the typical size is 75 m to 100 m made up of quadrilaterals and triangles.


Computational Domain Assembly and Execution

TUFLOW Fixed Grid Model

The TUFLOW model directly reads the provided ESRII ASCII DEM raster format, to set the extent of the computational domain and interpolate elevations at the 2D cell centers, mid-sides and corners. The boundary locations were digitized in GIS layers. The provided GIS land use layer was directly read for assigning roughness values.

Simulation results were viewed using SMS and GIS software. Calibration high water marks were loaded into a GIS layer and displayed within the GIS mapping to easily view the calibration performance of the model. TUFLOW’s 3D surfaces of peak water levels and depths were imported into the GIS to generate flood extent outlines.

TUFLOW FV Flexible Mesh Model

The approach taken to develop the TUFLOW FV Flexible Mesh model was:

  1. Using the SMS software with DEM shaded contours as a guide, develop mesh map (creating polygons of specific areas in the model that had a specific mesh design and resolution). The design was such that elements follow bathymetric contours and likely flow directions. Also ensure that narrow flow channels are well resolved and elements lie along center of flow channel.
  2. Create mesh, automatically generating geometry (z) values from the DEM.
  3. Setup input files, consisting of one input file and 3 boundary condition time series (csv files).
  4. Run simulation on Dell Laptop 64 bit Intel i7 2.8 GHz CPU.
  5. Several simulations performed with varying Manning’s friction applied.
  6. Within SMS, load shape file with high water marks and point inspect model results of maximum water level. Export to Excel, convert to feet.
  7. Export 3D water level and depth surfaces into GIS to produce maximum flood extent polygons.
  8. Discussion on Calibration

    A limited number of simulations were carried out to develop an understanding of the flood behavior and sensitivity of varying parameters. The results of these simulations are discussed below, some of which are provided in the ftp download.

    Simple Manning’s n / Topography Test

    The initial runs were carried out using the same Manning’s n over the entire model over a coarse resolution grid and flexible mesh. These runs were carried out using TUFLOW and TUFLOW GPU (30m grid), and TUFLOW FV (flexible mesh) models.


    The topography for these runs did not include any special provision for incorporating the levee and road embankments. The elevation sampling of the DEM was simply based on inspecting the DEM at the models’ elevation points. At this stage no 3D breaklines along the embankment crests were used to ensure the crest of the elevation was correctly represented by the models’ elevations.

    The Manning’s n used for the results provided was 0.035, which seems to give a reasonable first pass reproduction of the high water marks. A value of 0.035 is consistent with the global n value that would typically apply to this study area.

    Also of interest is the comparison between the three different 2D solvers TUFLOW, TUFLOW’s GPU Module and TUFLOW FV (all three use a different solution technique). There is generally good agreement between all three schemes.

    A high resolution .jpg image is provided in the ftp downloads for viewing the HWMs and results of these three simulations. Open “Images\FMA C2.n0.035.HWM All 2D Solvers.jpg” and zoom in and pan around to easily view the flow patterns (velocity arrows), water level contours every 0.2m (blue lines), depths (blue shading) and high water marks (red is the recorded value, light blue is TUFLOW, black is TUFLOW GPU and yellow is TUFLOW FV).

    NLCD Land Cover and Embankment Crests Included

    Additional simulations were carried out using TUFLOW that included the NLCD Land Cover GIS layer, and 3D breaklines of the levee and road embankments visible in the DEM and aerial photo. This scenario (we envisage) would probably be representative of the present day conditions, and not representative of the 1964 flood event conditions.

    The NLCD GIS layer was read directly by TUFLOW and Manning’s n values assigned to the different land covers as tabulated below. The water/river n value of 0.02 is considered at the lower end of typical n values for rivers based on numerous 2D model calibrations. Typically for the lower reaches of coastal rivers the in-bank n value is 0.022 to 0.025 with an acceptable range considered to be (0.02 to 0.03). In upper reaches, away from tidal influences, n values tend to be higher (0.025 to 0.04) for perennial rivers. Possible reasons for the low n value could be due to the river bathymetry accreting since 1964 (we assume the bathymetry provided is based on more recent surveys), or the inflows maybe high.

    The n values used are presented in the table below:

    Material ID Manning's n Description
    11 0.04 Dummy Open Water - Overwritten by digitised polygon
    21 0.05 Developed
    22 0.08 Developed
    23 0.1 Developed
    24 0.2 Developed
    31 0.03 Barren Land(Rock/Sand/Clay)
    41 0.05 Deciduous Forest
    42 0.05 Evergreen Forest
    43 0.06 Unknown
    52 0.1 Shrub/Scrub
    71 0.1 Grassland/Herbaceous
    81 0.04 Pasture/Hay
    82 0.05 Cultivated Crops
    90 0.1 Woody Wetlands
    95 0.1 Emergent Herbaceous Wetlands
    101 0.02 Water/Sand/Silt

    The NLCD land cover provided a poor representation of the in-bank river section when compared with the DEM and aerial photography. The river section was therefore digitized to replace the NLCD representation in the river. A general comment overall was that the NLCD land cover was not always in agreement with the aerial photo and somewhat poor in its accuracy and resolution.

    For the levee and road crests, GIS breaklines were digitized along the crests, and elevations sampled from the DEM. Ideally, ground surveys of these hydraulic controls would be available to ensure the crest is accurately modeled. TUFLOW reads the GIS breaklines and interpolates the crest elevation to the nearest 2D cell elevations to ensure the embankment height is correctly modeled.

    In general the comparison with the high water marks tends to be higher overall, but the distribution of flow has improved with less water travelling to the southern tidal entrance. In a few areas it is worse such as in the images below. In the images the red values are the 1964 HWMs, and the black the calculated peak levels. In these areas the presence of the embankments has a strong influence on the calibration results. To test this influence a further scenario removing two critical embankments was carried out as discussed further below.

    Critical Embankment1.jpg


    Critical Embankment2.jpg


    Removal of Major Embankments Scenario

    To test the effect of completely removing the embankments in the images above, the 15m and 30m TUFLOW models were used. Initially the 30m model was run as this is a quick running model so good for an initial sensitivity tests.

    The embankments were removed by digitizing the polygons shown in grey in the images below, and using TUFLOW’s Z Shape functionality that creates TINs within the polygons whose perimeters are merged with the surrounding ground levels to erase the embankments. This is a very quick process to do and setup (about 5 minutes in this case), and there is no need to rework the original DEM.

    The images below for the initial 30m grid run show the levels at the high water marks with and without the embankments at the two locations previously discussed. The red values are the 1964 HWMs, the blue values the without embankments scenario and the black values in brackets for the with embankments case previously discussed. An improvement in the calibration results tends to result.

    The 15m simulation provided an even better calibration, and gives the best overall performance of all simulations carried out. The maximum flood extent layer is provided in the ftp download for this simulation.

    In conclusion, we would surmise that some of the key embankments within the study area either did not exist at the time of the 1964 event or were of a lower height or configuration.

    Critical Embankment3.jpg


    Critical Embankment4.jpg


    The data was much easier to work with than the first challenge!

    No unexpected “challenges” for Challenge 2, but it is worth noting the challenges that arise in calibration exercises. Sometimes there is an expectation that models should be able to reproduce recorded levels to within a very small tolerance. In these situations there needs to be a good understanding/appreciation by both the client and the modeler of the uncertainties and reasons for discrepancies; and the acceptable tolerances between the modeling and recorded observations accordingly set.

    Are Manning’s n Values the Same for 1D and 2D models?

    Generally Manning’s n values are very similar for 1D and 2D schemes. Where there is rapid changes in flow direction and magnitude (eg. at a structure, sharp bend or embankment opening), fully 2D schemes will simulate energy losses associated with the change in flow patterns, whereas 1D schemes either require user specified energy losses (eg. a structure) or artificially increasing Manning’s n. In these situations 1D schemes may utilize higher Manning’s n values than 2D schemes. Conversely, 2D schemes typically apply no side wall friction, so if there is significant wall friction a 2D scheme may require a slightly lower Manning’s n than a 1D scheme.

    Calibration Challenges

    Key challenges to note when calibrating are discussed below (this is not an exhaustive list but is a starting point!):

    1. Recorded levels can themselves be quite uncertain. They should preferably be rated as to their accuracy and the type of flood mark noted with the recording. For example, a water mark in the wall of a house is a reliable, accurate mark of the peak water level; while a debris level is simply an indication that the flood was at least this high (debris marks may not be at the peak of the flood). Scanning through the high water marks in this study would indicate some inconsistencies. For example, in the northern end of the study area the 5.35 HWM in the image below is upstream of the 5.66 HWM. Either the 5.35 is low and/or the 5.66 is high. If the accuracy of the HWMs can’t be established, then as a generalization, the modeler should err on the high side in case the flood mark was not recorded at the flood peak. Critical Embankment5.jpg
    2. The modeler should NOT adopt unrealistic parameter values (eg. excessively low or high Manning’s n values) for the sole purpose of achieving a good calibration. It is invariably the fact that there are other uncertainties causing the discrepancy when unrealistic Manning’s n values are used. Unrealistic Manning’s n values or other parameters (eg. high eddy viscosity) distort the results and are a sure sign that there is something else wrong.
    3. Levees, roads, railways and other embankments can have a major influence on the flood behavior. Those embankments that overtop should be ground surveyed along their crests and the crest height correctly represented in the model’s elevations. Often for calibration events the height or presence of the embankments is not known accurately and this needs to be taken into account in the ability of a model to reproduce flood marks.
    4. The inflows to a model for historical floods often have a high degree of uncertainty, and are the most common reason for a poor calibration. The precise distribution spatially and temporally of the rainfall is not known (sometimes there is little or no rainfall data), and/or the rating curve at a model boundary has significant uncertainties. The significant uncertainties associated with developing model inflows should be understood and appreciated by modeler and client. Ideally, one or more recorded hydrographs would be available to the modeler to verify that the model can reproduce the shape and timing of the flood. If a hydrologic model is being used to generate the inflows, then the calibration exercise should be a joint exercise in calibrating both the hydrologic and hydraulic models.
    5. Inaccurate topography has become less of an issue in recent years with the advent of more accurate aerial surveys. However, the bathymetry of the main flowpaths, and storage capacity of floodplain backwaters, needs to be accurately represented if the model is to have any chance of reproducing flood marks. If these areas have permanent water and/or dense vegetation, the aerial surveys are still incapable of accurately surveying them, so other forms of survey maybe required. If accurate surveys are not available for these areas, this adds to the uncertainty in the modeling and the ability of the model to reproduce historical flood events. There is also the issue of using contour data instead of the raw terrain data to create the DEM as highlighted in our Challenge 1 discussion.
    6. Structures are often poorly represented due to lack of data. For example, in the aerial photograph below for Challenge 2 there appears to be some structures (which has two calibration points in the vicinity). However, with no details provided, the structure below can only be modeled as a simple opening in the embankment with no allowance for bridge decks, etc.
    7. Critical Embankment7.png