Tutorial M10 002 Check Files QGIS GPKG: Difference between revisions

Content deleted Content added
 
(7 intermediate revisions by 2 users not shown)
Line 1:
<span style="color:#FF0000">
<font size = 18>Page Under Construction</font>
</span>
= Introduction =
QGIS is used to import the check files and review the dam break.<br>
Line 12 ⟶ 9:
Review the check files: <br>
<ol>
<li>Open the file, either:
<li>Drag and drop the '''M10_5m_002_Check.gpkg''' from the '''Module_10\TUFLOW\check''' folder into QGIS.
:*Within the QGIS Browser Panel, navigate to '''Module_10\TUFLOW\check\M10_5m_002_Check.gpkg''' and double click the following layer, or
<li>Open the following layer into QGIS:
::*'''M10_5m_002_vzsh_zpt_check_P'''
:*In File Explorer, navigate to the '''Module_10\TUFLOW\check''' folder, drag and drop the '''M10_5m_002_Check.gpkg''' into the QGIS workspace and select the layer above.
<li>Use the 'Apply TUFLOW Styles to Open Layers'.
<li>Use the 'Apply GPKG Layer Names'.
Line 20 ⟶ 18:
Note: [35;70] is a unique identifier of the grid cell that the water level trigger point is contained within. It comes from the the grd_check layer where, in this example, the attribute 'n' is 35 and 'm' is 70 for the cell containing the trigger. <br>
<br>
{{Video|name=Animation_M10_GPKG_002_Check_01a.mp4|width=1230}}<br>
[[File:Animation M10 002 Check 01.gif]]<br>
</ol>
<br>