Difference between revisions of "Tutorial M10 002 Check Files QGIS GPKG"

From Tuflow
Jump to navigation Jump to search
 
(2 intermediate revisions by one other user not shown)
Line 16: Line 16:
 
<li>Use the 'Apply GPKG Layer Names'.
 
<li>Use the 'Apply GPKG Layer Names'.
 
<li>The vzsh_zpt_check file contains information on the elevation points that change over time, elevation change, final elevation and trigger conditions.<br>
 
<li>The vzsh_zpt_check file contains information on the elevation points that change over time, elevation change, final elevation and trigger conditions.<br>
Note: [36;71] is a unique identifier of the grid cell that the water level trigger point is contained within. It comes from the the grd_check layer where, in this example, the attribute 'n' is 35 and 'm' is 70 for the cell containing the trigger. <br>
+
Note: [35;70] is a unique identifier of the grid cell that the water level trigger point is contained within. It comes from the the grd_check layer where, in this example, the attribute 'n' is 35 and 'm' is 70 for the cell containing the trigger. <br>
 
<br>
 
<br>
{{Video|name=Animation_M10_GPKG_002_Check_01.mp4|width=1230}}<br>
+
{{Video|name=Animation_M10_GPKG_002_Check_01a.mp4|width=1230}}<br>
 
</ol>
 
</ol>
 
<br>
 
<br>

Latest revision as of 11:57, 21 August 2023

Introduction

QGIS is used to import the check files and review the dam break.

Method

This tutorial introduces:

Review the check files:

  1. Open the file, either:
    • Within the QGIS Browser Panel, navigate to Module_10\TUFLOW\check\M10_5m_002_Check.gpkg and double click the following layer, or
    • M10_5m_002_vzsh_zpt_check_P
    • In File Explorer, navigate to the Module_10\TUFLOW\check folder, drag and drop the M10_5m_002_Check.gpkg into the QGIS workspace and select the layer above.
  2. Use the 'Apply TUFLOW Styles to Open Layers'.
  3. Use the 'Apply GPKG Layer Names'.
  4. The vzsh_zpt_check file contains information on the elevation points that change over time, elevation change, final elevation and trigger conditions.
    Note: [35;70] is a unique identifier of the grid cell that the water level trigger point is contained within. It comes from the the grd_check layer where, in this example, the attribute 'n' is 35 and 'm' is 70 for the cell containing the trigger.



Conclusion

  • The topographic modifications representing the dam break were inspected.