Flood Modeller Tutorial Module01: Difference between revisions

Content deleted Content added
Line 164:
:<font color="blue"><tt>Read GIS X1D Network</tt></font> <font color="red"><tt>== </tt></font>..\model\gis\1d_x1d_FMT_M01_nwk_001_L.shp <font color="green"><tt>! GIS layer representing channels to allow for the digitisation of Water Level Lines (optional)</tt></font>
:<font color="blue"><tt>Read GIS X1D WLL</tt></font> <font color="red"><tt>== </tt></font> ..\model\gis\1d_x1d_WLL_FMT_M01_001_L.shp <font color="green"><tt>! GIS layer containing WLLs for visualising 1D results in 2D (optional)</tt></font>
 
<li> Add commands to read in the an Esty Control File which contains references to some of the culverts present on the floodplain: <br> </li>
:<font color="blue"><tt>ESTRY Control File</tt></font> <font color="red"><tt>== </tt></font>..\model\FMT_M01_001.ecf <font color="green"><tt>!Reference the ESTRY Control File </tt></font>
 
<li> Finally, update the links to the Geometry control file, the Boundary Condition control file and the bc_dbase file:</li>
:<font color="blue"><tt>Geometry Control File</tt></font> <font color="red"><tt>== </tt></font>..\model\FMT_M01_001.tgc
:<font color="blue"><tt>BC Control File</tt></font> <font color="red"><tt>== </tt></font>..\model\FMT_M01_001.tbc
:<font color="blue"><tt>BC Database</tt></font> <font color="red"><tt>== </tt></font>..\bc_dbase\bc_dbase_FMT_M01.csv)</tt></font>
 
This concludes the changes that we need to make to the .tcf