TUFLOW SWMM Tutorial M01: Difference between revisions

Content deleted Content added
Line 297:
 
= Conclusion =
:*EPA SWMM Culvertsculverts were added to convey water through the structures under the three roads in the tutorial model.
:*Check files were used to review the application of the boundary links.
:*Results through the 1D network structures were assessed.