The table below highlights some of the commonly used check files when reviewing 1D culverts. The full list of TUFLOW check files can be found [[TUFLOW_Check_Files | here]]. <br>
 
The table below highlights some of the commonly used check files when reviewing 1D culverts. The full list of TUFLOW check files can be found [[TUFLOW_Check_Files | here]]. <br>
 
<br>
 
  
 
{| align="left" class="wikitable" width="20%"
 
{| align="left" class="wikitable" width="20%"
Line 102: Line 100:
  
 
<br><br><br><br><br><br><br><br>
 
<br><br><br><br><br><br><br><br>
<br><br><br>
+
<br>
  
  

Revision as of 03:36, 12 February 2016

Page Under Construction


Introduction


  • Advice on SX connections & number of cells to connect to 2D domain – implications
  • Flow regimes – theory behind each.
  • How to check for the flow regime – link to check file
  • How do we sub divide logic rules (operational culverts)*
  • Losses – fixed, Englehund, automatic manholes etc.
  • Provide some justification on the ‘default’ height/width, entry/exit losses.

1D-2D Connections

Connection of a 1D drainage network to the 2D domain typical occurs using one of the following features:

  • 1D inlet pits (more details can be found here).
  • Manually assigned 2D SX connections

Information on how to create a 1D-2D connection in GIS are explained within Tutorial 2.

SX Connection Hints

To limit the doubling up of expansion and contraction losses on a culvert (as 1D nwke culverts will already contain height, width, entry and exit coefficients) the 2D flow into and out of a culvert should be as representative of the culvert dimensions. You can achieve this by selecting the number of 2D cells that best matches the width/diameter of your particular culvert. The example below shows a 4m culvert that has used an SX line to select 2 x 2m grid cells to discharge to. Remember that the selection of a particular cell, when using a polyline, requires the polyline intersect the cell cross-hair - see Section 7.4 2D Boundaries within the TUFLOW manual.
Culvert SX connection 1.JPG

Standard SX connections on the 1D network to the 2D domain where the terrain surface (cell elevations) is greater than the 1D node level will result in an Error 2050. Details about this error can be found here.

  • 2D SX connection
  • 2D SX connection - Section view


Including a "Z" flag will only lower the selected 1D-2D cell. The level of water within the hole will need to increase above the surrounding surface before it will flow into the 2D domain. Using the "Z" can lead to instability issues so it is important to ensure the DTM modification is appropriate in your model. Details about this warning can be found here.

  • 2D SX connection with "Z" flag
  • 2D SX connection with "Z" flag - Section view


Including a Zline or Zshape that modifies the surrounding topography removes any warning or error, in this particular case the Zline also creates a smooth transition for water to flow from the culvert. No need for a "Z" is required.

  • 2D SX connection with Zline
  • 2D SX connection with Zline - Section view

Flow Regimes

The flow regime through a culvert are divided into the following types. Checking this information for any 1D culvert can be inspected from the _TSF.mif/_TSF_P.shp that outputs the regime at each output interval.

Regime Description
A Unsubmerged entrance and exit. Critical flow at entrance. Upstream controlled with the flow control at the inlet.
B Submerged entrance and unsubmerged exit. Orifice flow at entrance. Upstream controlled with the flow control at the inlet.
C Unsubmerged entrance and exit. Critical flow at exit. Upstream controlled with the flow control at the culvert outlet.
D Unsubmerged entrance and exit. Sub-critical flow at exit. Downstream controlled.
E Submerged entrance and unsubmerged exit. Full pipe flow. Upstream controlled with the flow control at the culvert outlet.
F Submerged entrance and exit. Full pipe flow. Downstream controlled.
G No flow. Dry or flap-gate active.
H Submerged entrance and unsubmerged exit. Adverse slope. Downstream controlled.
J Unsubmerged entrance and exit. Adverse slope. Downstream controlled.
K Unsubmerged entrance and submerged exit. Critical flow at entrance. Upstream controlled with the flow control at the inlet. Hydraulic jump along culvert
L Submerged entrance and exit. Orifice flow at entrance. Upstream controlled with the flow control at the inlet. Hydraulic jump along culvert.




















Example of the _TSF results in GIS:
TSF result file.JPG
The GIS results for the _TSF layer show the flow regime that was recorded at each output interval.

Operational Control

Typical check files used

The table below highlights some of the commonly used check files when reviewing 1D culverts. The full list of TUFLOW check files can be found here.

Filename prefix / suffix
_inverts_check.mif
_inverts_check_P.shp
|
_iwl_check.mif
_iwl_check_P.shp
|
_nwk_C_check.mif
_nwk_C_check_L.shp
|
_nwk_N_check.mif
_nwk_N_check_P.shp
|