TUFLOW SWMM Tutorial M02: Difference between revisions
Content deleted Content added
Line 251:
To complete the pipe network, 1D/2D linkage is needed at the outlet of the pipe network. The '<u>[[QGIS_SWMM_BC_Create_Channel_Endpoint_1D/2D_Connections |BC - Create channel endpoint 1D/2D connections]]</u>' tool will be used to automate this process.
<ol>
<li>In the QGIS Layers
<li>Use the 'Select Features' tool to select the most downstream object in '''Links--Conduits'''.
<li>In the Processing Toolbox, go to '''TUFLOW > SWMM''' and select '<u>[[QGIS_SWMM_BC_Create_Channel_Endpoint_1D/2D_Connections |BC - Create channel endpoint 1D/2D connections]]</u>'. This opens the dialog shown below.
Line 269:
<li>Click 'Run'.
<li>Once the tool is finished, click 'Close'.
<li>The '''2d_bc_SWMM_Pipe_Network_Connections_001_L''' appears in the QGIS Layers
<li>Turn off editing to save the edits.
<br><br>
| |||