Possible use cases include:
* Where the screen is attached directly to the culvert inlet or outlet, the losses are applied to the culvert itself.
* Where the screen is located upstream of a culvert inlet or downstream of a culvert outlet, modelled as a short zero length CF, IF, or RF channel before (upstream) or after (downstream) the culvert as appropriate.
* In all cases, the net flow area should be reduced to account for the bars and any debris blockage, either by adjusting the flow area directly or by using the pBlockage attribute.<br>
For example, the image below could be represented as a rectangular shaped screen located upstream or downstream of a culvert, modelled as a short zero length RF (rectangular culvert with fixed losses) channel inusing thea 1d_nwk GIS layer.<br>[[File:Trash screen schematic.png|frameless]]<br><br>
 