Tutorial M11 001 GIS Inputs QGIS GPKG: Difference between revisions

Content deleted Content added
Line 126:
<li>The 2d_bc SX points are snapped to the 1d_nwk culvert:<br>
<br>
[[File:Animation M11 001 GIS 05Animation_M11_GPKG_001_GIS_05.gif]]<br>
<br>
</ol>
Line 139:
<li>The CN lines connect the HX lines to the 1D channel. Where a CN line is connected to the HX line, the water level from the 1D nodes is transferred to the HX line. In between 1D nodes a linear interpolation of water level is applied. <br>
<br>
[[File:Animation M11 001 GIS 06aAnimation_M11_GPKG_001_GIS_06.gif]]<br>
<br>
</ol>