TUFLOW SWMM Tutorial M01: Difference between revisions
Content deleted Content added
Chris Huxley (talk | contribs) |
Chris Huxley (talk | contribs) |
||
Line 372:
= Conclusion =
*EPA SWMM culverts were added to convey water through the structures under the three roads in the tutorial model.
*Check files were used to review the
*Results through the 1D culverts were assessed.
<br>
| |||