Tutorial M10 001 Check Files QGIS: Difference between revisions

From Tuflow
Jump to navigation Jump to search
Content deleted Content added
Created page with "= Introduction = QGIS is used to import the check files and review the dam break.<br> <br> = Method = This tutorial introduces: :* _DEM_Z.flt :*C..."
 
No edit summary
Line 10: Line 10:
:*[[Check_Files_2d_sh_obj | _sh_obj_check_R.shp]]
:*[[Check_Files_2d_sh_obj | _sh_obj_check_R.shp]]
:*[[Check_Files_2d_grd | _grd_check_R.shp]]
:*[[Check_Files_2d_grd | _grd_check_R.shp]]
:*[[Check_Files_2d_bcc_check | _bcc_check_R.shp]]
:*[[Check_Files_2d_sac | _sac_check_R.shp]]


Review the check files: <br>
Review the check files: <br>
Line 19: Line 21:
:*'''M10_5m_001_sh_obj_check_R.shp'''
:*'''M10_5m_001_sh_obj_check_R.shp'''
:*'''M10_5m_001_grd_check_R.shp'''
:*'''M10_5m_001_grd_check_R.shp'''
:*'''M10_5m_001_bcc_check_R.shp'''
:*'''M10_5m_001_sac_check_R.shp'''

<li>Use the 'Apply TUFLOW Styles to Open Layers'.
<li>Use the 'Apply TUFLOW Styles to Open Layers'.
<li>The DEM_Z grid shows the final elevations (at time 0) used for the model calculations. The elevation changes due to the dambreak are inspected in the Results section.<br>
<li>The DEM_Z grid shows the final elevations (at time 0) used for the model calculations. The elevation changes due to the dambreak are inspected in the Results section.<br>
Line 33: Line 38:
<br>
<br>
[[File:Animation M10 001 Check 03.gif]]<br>
[[File:Animation M10 001 Check 03.gif]]<br>
<br>
<li>The sac_check contains information on the lowest cells for each SA boundary region. The upstream 2d_bc QT inflow was replaced with a 2d_sa inflow.
<li>The bcc_check contains information on the 2D boundaries, it shows the cells conveying water out of the model selected by the 2d_bc HQ type boundary (based on a slope).<br>
<br>
[[File:Animation M10 001 Check 04a.gif]]<br>
</ol>
</ol>
<br>
<br>

Revision as of 23:25, 12 May 2022

Introduction

QGIS is used to import the check files and review the dam break.

Method

This tutorial introduces:

Review the check files:

  1. Open the following files from the Module_10\TUFLOW\check folder:
    • M10_5m_001_DEM_Z.flt
    • M10_5m_001_zsh_zpt_check_P.shp
    • M10_5m_001_vzsh_zpt_check_P.shp
    • M10_5m_001_sh_obj_check_R.shp
    • M10_5m_001_grd_check_R.shp
    • M10_5m_001_bcc_check_R.shp
    • M10_5m_001_sac_check_R.shp
  2. Use the 'Apply TUFLOW Styles to Open Layers'.
  3. The DEM_Z grid shows the final elevations (at time 0) used for the model calculations. The elevation changes due to the dambreak are inspected in the Results section.
  4. The zsh_zpt_check file contains the Zpts modified by the 2d_zsh layers with updated elevation, change in elevation and source layer. The Shape_Width attribute is specified the same as the cell size, a thick breakline is used with entire cells being modified. The TUFLOW style colour codes the symbols based on the amount raised, or lowered.



  5. The vzsh_zpt_check file contains information on the elevation points that change over time, elevation change, final elevation and trigger conditions.
  6. The sh_obj_check file displays the TIN triangles created by TUFLOW during the model initialisation and is useful to review for all merge polygons.



  7. The grd_check is the 2D grid defined by the 2d_code layer and contains a region object for each cell with attributes, e.g. the IWL.



  8. The sac_check contains information on the lowest cells for each SA boundary region. The upstream 2d_bc QT inflow was replaced with a 2d_sa inflow.
  9. The bcc_check contains information on the 2D boundaries, it shows the cells conveying water out of the model selected by the 2d_bc HQ type boundary (based on a slope).



Conclusion

  • The topographic modifications representing the dam wall, dam break and initial water level were inspected.


Up
Back to Module 10 Main Page