TUFLOW SWMM Tutorial M03: Difference between revisions

Content deleted Content added
Line 225:
:::*Maximum Depth Option (Ymax): 'Set to 0.0'.
:::*Nodes receiving subcatchment flows option (if connected to 2D): 'Set Apond = 0.0; Ksur = 0.0 (overwrites options below)'.
:*Nodes connected to 2D without Inlets (through embankment culvert):
:::*Ysur: 0
:::*Area of ponding: 50
:*Nodes connected to the 2D with Inlets (underground pipe network):
:::*Maximum depth: 'Use global option'.
:::*Ysur: 0