TUFLOW Check Files: Difference between revisions
Content deleted Content added
Anne.Kolega (talk | contribs) m →1D Check Files: corrected grammar |
|||
Line 127:
Any generated pit channels are shown as a small channel flowing from north to south into the pit node. The upstream pit channel node that is generated is also shown. The length of the pit channel is controlled by <font color="blue"><tt>Pit Channel Offset </tt></font> <font color="red"><tt>==</tt></font> command.
|-
| [[Check_Files_1d_nwk_N | _nwk_N_check]]|| GIS layer of the final 1D model network.
'''This is very useful for checking for channel ends or nodes that are not snapped.'''<br>
|-
| |||