Tutorial Module02 Archive: Difference between revisions
Content deleted Content added
No edit summary |
|||
Line 145:
The model was simulated and the 1D results reviewed using a combination of GIS software and Excel.<br>
In the next module of the tutorial we will be modifying the 2D topography to incorporate surveyed breaklines. This can be found on the [[Tutorial_Module03_Archive | Module 3]] page.<br>
In Module 4 we will model the creek as 1D channels, linked to the 2D model. This module has not yet been updated to the online wiki format, the previous version (MapInfo only) can be found
=Troubleshooting=
| |||